How Long Do Kitchen Renovations Take?

August 13, 20237 min read

The time it takes to complete a kitchen remodel depends on the scope of the project. Smaller projects, such as replacing countertops and cabinets, painting walls, or upgrading appliances can take anywhere from 1-2 weeks.

A larger kitchen remodel that includes structural changes, plumbing, and electrical rewiring may take several weeks or even months depending on the complexity of the kitchen remodeling project. In some cases, a complete kitchen renovation may take up to six months or more.

So what factors play the greatest role in determining the actual timeframe for a kitchen remodeling project? In this blog post, we will discuss the that factors go into if a dream kitchen remodel takes a few weeks or several months.

The design phase of the kitchen renovation project

how long do kitchen renovations take | Alabama Construction Pros

The first step of any remodeling process, including a kitchen renovation, is the design process. At this stage, you will collaborate with a designer or contractor to select the layout and selections for your project.

This can take from 1-4 weeks depending on how complicated the project is, and what you want. It’s also important to get all the measurements and details right so that the renovation phase can go smoothly.

Securing permits and inspections

Once the layout for your kitchen remodeling project has been finalized and selections have been made, the contractor will know what permits and inspections will be needed before moving forward with the construction and installation phase.

The average timeframe for securing permits and inspections can take anywhere from 1 week to 3 months, depending on the city or municipality you live in. It’s important to factor this into your plan as it could potentially delay your project.

Construction and Installation

The actual construction and installation of the materials can take from 1-12 weeks depending on the project. Whether or not your keeping the same layout makes a difference in the kitchen remodeling project timeline as well.

Size of the kitchen

The expected construction and installation time for a typical kitchen remodel will vary based on several factors. Size is one factor. Larger kitchen renovations could take several months. The complexity of the design and the level of customization required will also affect the timeline.

Major structural changes and project complexity 

During a kitchen remodel, many structural changes could impact the estimated timeline of the project. Some of the most popular changes include relocating utilities or appliances, adding new electrical wiring, removing walls to create an open-concept design, and adding new doors or windows for more natural light and ventilation.

However, before these changes can be made, it is important to assess the structural integrity of the home and whether any load-bearing walls or wiring systems will be impacted.

When evaluating structural changes, it is important to consider several factors such as permits, potential plumbing or electrical work, and the involvement of other contractors. 

Although necessary repairs and delays may add time to the project, it is important to tackle them before the renovation begins to avoid hidden costs and complications later on.

Demolition phase

how long do kitchen renovations take | Alabama Construction Pros

Once the design phase has been completed and approved, the next step is the demolition phase. During this stage, the process can take from 2-4 days depending on the size of your kitchen and what needs to be done.

The demolition phase of a kitchen renovation usually involves the removal of the existing cabinets, countertops, appliances, fixtures, and sometimes flooring or walls. This is necessary to make way for new and improved components that will be installed during the renovation.

During the demolition phase, the contractor will first disconnect and remove all appliances and fixtures such as sinks, ovens, and refrigerators. Then, the cabinets will be taken down and removed. This is often a messy and dusty process, so protective coverings may be placed over nearby furniture or surfaces to prevent damage.

If any structural changes are being made, such as removing walls or expanding doorways, this will also be done during the demolition phase, which adds time to the overall kitchen renovation timeline. In some cases, the flooring may be removed if it is being replaced or repaired.

Materials you intend to use for your renovation project

how long do kitchen renovations take | Alabama Construction Pros

When it comes to a kitchen remodel, choosing the right materials is key. Not only can the type of materials affect the overall look and feel of the space, but it can also impact the timeline of the renovation.

Custom cabinetry and custom countertop fabrication can affect the timeline

Some materials, such as natural stone countertops or custom cabinetry, may require longer lead times for delivery or fabrication, which can cause delays in the project. On the other hand, opting for prefabricated or pre-finished materials can often save time and avoid complications in the installation process.

Why do custom kitchen cabinets take so long?

The lead time for custom cabinets can vary greatly depending on several factors. One of the most significant factors is the size of the kitchen and the number of cabinets that need to be built. Typically, the more cabinets are required, the longer the production process may take. A very large kitchen with many custom cabinets may take several weeks or even months to complete.

Another factor that can affect the lead time is the complexity of the cabinet design. Cabinets with intricate designs, such as detailed woodworking or unique shapes, will take longer to produce than simpler designs. Likewise, if the cabinets require special features like pull-out shelves or hidden storage compartments, the lead time can also increase accordingly.

how long do kitchen renovations take | Alabama Construction Pros

The material used to construct the cabinets plays a significant role as well. Hardwood materials like oak or maple are popular for their durability and beauty, but they may take longer to produce than cabinets made from other materials. If exotic or rare species of wood are chosen, this may also require additional time to source and work with.

The primary factor that affects lead times for custom cabinets is the availability of specialized labor. A skilled craftsman must fabricate and assemble each cabinet by hand, so the availability of experienced carpenters and other experts in the field can impact how long it takes to complete the project.

This may be particularly true if your kitchen renovation requires that the cabinets be made to unusual specifications or with highly specific finishes.

As a general rule of thumb, it can take anywhere from 6 to 12 weeks to manufacture custom cabinets for a typical kitchen renovation project.

Overall, carefully considering the materials chosen for a kitchen renovation can help ensure a smooth and efficient timeline for the project.

Planning the build or the pre construction phase

how long do kitchen renovations take | Alabama Construction Pros

Before beginning a kitchen remodel, homeowners should prepare for the pre-construction phase. This phase typically includes creating a renovation plan, establishing a budget, and hiring a contractor.

The first step is to create a renovation plan. This should involve assessing the current layout of the kitchen, identifying what changes are necessary, and determining which materials and appliances you would like to use. A renovation plan should also include a detailed budget and a timeline for the project.

The estimated timeline for the pre-construction phase can vary depending on the specifics of the project. Generally, it can take anywhere from 2-6 weeks to complete the pre-construction phase. 

During this time, the contractor will work with the homeowner to finalize the renovation plan and budget, create a timeline for the project, and obtain any necessary permits.

The current condition of your kitchen

The current condition of a kitchen can have a significant impact on the timeline of a kitchen remodel. If the kitchen is outdated or poorly designed, more work may be needed to bring it up to modern standards and make it functional.

Pre-existing damage

If there is pre-existing damage, such as water damage, insect infestation, or structural issues, it will need to be addressed before any work can begin. This will add time to the overall project timeline, and can also add costs to the budget.

Check out our other blogs for more advice and tips on your home renovation projects

We hope this blog helped give you a better understanding of kitchen remodels and their construction schedule timelines. If you need information about 10 ways to control dust during a remodel, or if living in a house during a remodel is a good idea, check out the linked articles.

You can also get in touch with us if you a free consultation for your kitchen remodel.

Alabama Construction Pros, LLC

Back to Blog

We've answered the most frequent questions homeowners have when selecting a contractor in our comprehensive Buyer's Guide. Get your copy now!

This 100% free resource can save you a ton of research time. It's answered all of the important questions that you need to know when selecting a contractor, in one convenient downloadable eBook. Just fill out your information below for your free copy:

Contact Us if You Have Any Questions


Thank you for reading our blog! We're glad you're considering Alabama Construction Pros for your remodeling or design project and hope our blog has given you some inspiration. If you have specific questions about a project, we offer free initial consultations. This is a great opportunity to discuss your vision with one of our experienced remodelers.


We're dedicated to making your dream home a reality, so please don't hesitate to contact us. We look forward to hearing from you soon!


Serving Montgomery Alabama, Auburn Alabama, Lake Martin & Surrounding Areas

Office: 4144 Carmichael Rd, Montgomery, AL 36106| (334) 310-8455

Montgomery AL | Prattville AL | Millbrook AL | Wetumpka AL |

Pike Road AL | Lake Martin| Eclectic AL | Dadeville AL| Alexander City AL | Auburn AL |

Tuskegee AL | Opelika AL

4144 Carmichael Rd, Montgomery, AL 36106, USA

Copyright © 2023 Alabama Construction Pros | Terms and Conditions | Privacy Policy